This month’s projects – May 2015

May saw the Nusteel erection teams install another foot / cycle bridge over the A38, although this time the bridge was for Heathfield, near Newton Abbot in Devon. As well as a 41m Bow Warren span (as above on the way to site) the bridge features 106m of Warren truss ramps, 112m of Twin Stringer… Read more

This month’s projects – April 2015

April saw us busy with footbridge installations.  First there was a 30m Warren truss at Lower Darcy Street in Bolton.  Next it was over to Wrexham in Wales to install a 50m by 3m Warren truss before heading down to Cornwall for another Warren truss, this time at 48m in length, to go over the… Read more

This month’s projects – March 2015

During March Nusteel’s erection teams have been working at Corsham in Wiltshire to install a footbridge at the railway station.  Although closed to passengers in 1965, growth of the town has led to a campaign to reinstate the station.  Nusteel are proud to have provided and installed the new plate girder footbridge which was required… Read more

This month’s projects – February 2015

February saw Nusteel’s erection team in Stafford installing the above footbridge over the River Sow and the Staffordshire and Worcestershire Canal at Baswich.  Comprising two 24m Vierendeel spans with a bowed top chord and some 390m of Twin Stringer ramps. The completed structure was installed onto concrete piers over the flood plains adjacent to the… Read more