Project: F25045 Manning’s Heath Footbridge
Description: 50 metre mesh canopy and hand rail fitted to existing concrete bridge structure. Initially Nusteel was commissioned just to design the canopy by Poole Council, we were later commissioned to build and install it by Osborne’s.
Period: May December 2005
Client: Geoffrey Osbourne Limited

Project: G25011 Omnia Plank Placing Travelling Gantry
Description: An extremely large speciality design. The gantry was used to assist with the building of the Swwale bypass in North Kent, by lifting
up and sliding in to place the concrete deck panels to form the new road crossing. Once the bypass was completed the gantry was removed and the steel recycled.
Period: December 2004 August 2005
Client: Chart Engineering

Project: F25001 Railshead Pipe Bridge
Description: A 14 metre Pipe Bridge Span
Period: November 2004 January 2005
Client: McNicholas Plc

Project: F24040 Walton Well Road Footbridge Stepped Ramp
Description: A 15 metre Stepped Ramp onto existing Footbridge.
Period: October 2004 January 2005
Client: Oxford City Council

Project: G24002 M5 Junctions 2 to 3 Gantry Modifications
Description: Removal from Three Gantries, 9 No “Matrix Windows” and transport to Nusteel for modification and protective painting. The Matrix Windows will then be refitted the following weekend.
Period: November December 2003
Client: Techspan Systems Limited
|