Project: F25045 Manning’s Heath Footbridge

Description: 50 metre mesh canopy and hand rail fitted to existing concrete bridge structure. Initially Nusteel was commissioned just to design the canopy by Poole Council, we were later commissioned to build and install it by Osborne’s.

Period: May – December 2005

Client: Geoffrey Osbourne Limited





Project: G25011 Omnia Plank Placing Travelling Gantry

Description: An extremely large speciality design. The gantry was used to assist with the building of the Swwale bypass in North Kent, by lifting
up and sliding in to place the concrete deck panels to form the new road crossing. Once the bypass was completed the gantry was removed and the steel recycled.

Period: December 2004 – August 2005

Client: Chart Engineering



Project: F25001 Railshead Pipe Bridge

Description: A 14 metre Pipe Bridge Span

Period: November 2004 – January 2005

Client: McNicholas Plc



Project: F24040 Walton Well Road Footbridge Stepped Ramp

Description: A 15 metre Stepped Ramp onto existing Footbridge.

Period: October 2004 – January 2005

Client: Oxford City Council



Project: G24002 M5 Junctions 2 to 3 Gantry Modifications

Description: Removal from Three Gantries, 9 No “Matrix Windows” and transport to Nusteel for modification and protective painting. The Matrix Windows will then be refitted the following weekend.

Period: November – December 2003

Client: Techspan Systems Limited