This month’s projects – April 2015

April saw us busy with footbridge installations.  First there was a 30m Warren truss at Lower Darcy Street in Bolton.  Next it was over to Wrexham in Wales to install a 50m by 3m Warren truss before heading down to Cornwall for another Warren truss, this time at 48m in length, to go over the Eastern arm of the A38 at the Carkeel Roundabout project near Saltash (shown above).