This month’s projects – February 2015

February saw Nusteel’s erection team in Stafford installing the above footbridge over the River Sow and the Staffordshire and Worcestershire Canal at Baswich.  Comprising two 24m Vierendeel spans with a bowed top chord and some 390m of Twin Stringer ramps. The completed structure was installed onto concrete piers over the flood plains adjacent to the waterways to allow for flooding and will be known as Two Waters Way when it opens in March 2015.