This month’s projects – January 2015

Nusteel have started 2015 by installing a 57 metre Sunburst Vierendeel Footbridge together with 96 metres of Twin Stringer Ramps at Broadbridge Heath, Horsham, West Sussex.

Due to the size of the structure, it was transported to site in four sections which were then bolted together before the final lift.  The old footbridge (seen in the background above) was removed by our site team during the following week’s road closure.