This month’s projects – July 2014

This month we have again been busy installing gantries on the M25 including the super span shown above.  Due to the length of this gantry, at 64 metres, the structure was fabricated and transported to site in three pieces. These were then spliced together on site before finally being lifted in to place using a 500 tonne crane utilising a super-lift.

In New Market, Cambridge, we installed a 17m LM span with a mesh canopy and approximately 97 metres of Twin Stringer Ramps at Kennett Station (below).

20141104_110508